«Звезда» начала строительство третьего танкера-продуктовоза MR

Zvezda Starts Building Third LNG-Powered MR Product Tanker

  • Извините, этот техт доступен только в “Eng”.

    Zvezda Shipbuilding Complex has started building a third LNG-powered MR product tanker, with steel cutting commenced, the yards said in a statement.

    The 50 dwt tanker will have a length of over 180 m and a width over 32 m with a draft of 13 m. The vessel will have a 1B ice class allowing it to operate year-round in the ice conditions of the Baltic.

    The tankers of the series are designed for transporting oil products and condensed gas and will be deployed on long-term time-charter agreements between Sovcomflot and Novatek.

    The vessels will be powered by liquefied natural gas.


  • Добавить комментарий

    Новости по теме
    16.02.2021
    Впервые в истории крупнотоннажное грузовое судно – газовоз «Кристоф де Маржери» – осуществляет переход […]
    22.04.2021
      Танкер Aframax «ONEX Peace» первым в мире получил нотацию классификационного общества DNV по […]
    10.03.2021
    Фото парящего в воздухе танкера вызвало ажиотаж в соцсетях Великобритании. Местный житель Дэвид Миррис […]
    18.01.2021
    16 января в 20.20 по Москве газовоз «Кристоф де Маржери» достиг траверза мыса Дежнева […]
    21.05.2021
    Frontline подписал соглашение о приобретении по схеме переуступки шести строящихся ECO-танкеров VLCC последнего поколения. […]
    27.12.2021
    В ночь с 25 декабря на 26 декабря при следовании с грузом из порта […]


  •  




  • Войти
  • Поля не найдены.
  • Поля не найдены.