Первое судно у нового причала в Темрюке

First Vessel Loaded at New Berth in Temryuk

  • Извините, этот техт доступен только в “Eng”.

    The first vessel has been handled at the new berth built in the port of Temryuk at the terminal operated by TemryukMorTrans. The tanker “VF Tanker-13” loaded over 5.5 thousand tons of heavy aromatic hydrocarbons, Rosmorport reports.

    The two-berth oil products terminal in Temryuk was put into operation in October 2021. The facility can accommodate vessels up to 140.8 m LOA, 17 m beam and with a draft of 4.6 m (laden).

    The project capacity of the first phase of the terminal is 2.1 mn tons. When fully developed in 2025, the terminal will be capable of handling up to 12 mn tons annually.

    Photo: Rosmorport

     


  • Добавить комментарий

    Новости по теме
    08.08.2022
    В морских пунктах пропуска Кавказ и Темрюк запущено шесть новых морских паромов типа ро-ро, […]
    14.12.2022
    ООО «Порт Мечел-Темрюк» (входит в транспортный дивизион Группы «Мечел» под управлением ООО «УК Мечел-Транс») […]
    13.07.2022
    Лоцман Таманского управления Азово-Черноморского бассейнового филиала ФГУП «Росморпорт» Константин Дереберя вывел из морского порта […]
    29.03.2022
    Буксиры «Адмирал Серебряков» и «Адмирал Лазарев» Таманского управления Азово-Черноморского бассейнового филиала ФГУП «Росморпорт» обеспечили […]


  •  




  • Войти
  • Поля не найдены.
  • Поля не найдены.