Murmansk Commercial Sea Port has completed loading three shipments of dome structures elements for LNG tanks designated or Sabetta.
Ten structural elements each measuring 37.5 meters long weighing more than 800 tons in total was handled, the port said in a statement.
The operations were performed at Berth 15, which is used for handling cargo designated for large-scale infrastructure Arctic projects.
Photo: Murmansk Commercial Sea Port