В Темрюке построят нефтеналивной терминал

Oil Product Terminal Project for Temryuk Gets Approval

  • Извините, этот техт доступен только в “Eng”.

    The Main Department of State Expertise has approved the project documentation and the engineering survey results for the project to build an oil product terminal in the port of Temtyuk.

    The project is to be developed in three stages. At Stage 1, two berths for light and dark oil products and shore-based infrastructure are to be built. The quay length will make 331.7 m.

    At Stage 2, dredging is planned to develop the terminal basin and navigation aides are to be installed. At Stage 3, additional standers will be added so that the terminal should be capable of handle any sort of oil products.

    The project capacity of the terminal is 2.1 mn tons per annum

    The developer of the project is TemryukMorTrans.


  • Добавить комментарий

    Новости по теме
    27.04.2020
    В апреле после сложных и затяжных переговоров стран участниц ОПЕК+, видеоконференция длилась четыре дня […]
    14.05.2020
    В нее войдет несколько крупных портовых и судостроительных проектов.


  •  




  • Войти
  • Поля не найдены.
  • Поля не найдены.