В Темрюке построят нефтеналивной терминал

Oil Product Terminal Project for Temryuk Gets Approval

  • Извините, этот техт доступен только в “Американский Английский”. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.

    The Main Department of State Expertise has approved the project documentation and the engineering survey results for the project to build an oil product terminal in the port of Temtyuk.

    The project is to be developed in three stages. At Stage 1, two berths for light and dark oil products and shore-based infrastructure are to be built. The quay length will make 331.7 m.

    At Stage 2, dredging is planned to develop the terminal basin and navigation aides are to be installed. At Stage 3, additional standers will be added so that the terminal should be capable of handle any sort of oil products.

    The project capacity of the terminal is 2.1 mn tons per annum

    The developer of the project is TemryukMorTrans.


  • Комментарии: 0

    Добавить комментарий

    Новости по теме
    27.04.2020
    В апреле после сложных и затяжных переговоров стран участниц ОПЕК+, видеоконференция длилась четыре дня […]
    14.05.2020
    В нее войдет несколько крупных портовых и судостроительных проектов.

  • Войти