Локализация оборудования для СПГ-проектов

Novatek Aims to Localize Manufacturing LNG Production Equipment

  • Novatek and Atomenergomash, a mechanical engineering division of Rosatom State Corporation, signed a memorandum on strategic partnership and localizing the fabrication of critical equipment for LNG production.

    According to Novatek, the memorandum notes the results already achieved on the fabrication of coil-wound heat exchangers and medium-tonnage cryogenic pumps, and establishes the obligations of the Parties on design, manufacturing and conducting pilot tests of high-tonnage cryogenic pumps.

    According to the memorandum, the parties intend to pursue long-term cooperation to localize the fabrication of pumps, heat exchangers and other equipment for Novatek’s LNG projects at the facilities of Atomenergomash.

     “This memorandum is important for the development of the Russian gas industry and the implementation of our new LNG projects using domestic technologies and equipment,” noted Alexander Fridman, First Deputy Chairman of the Novatek Management Board.

    “Atomenergomash has already fabricated and shipped heat exchangers and cryogenic pumps for Yamal LNG’s Train #4 utilizing NOVATEK’s patented “Arctic Cascade” gas liquefaction technology. This equipment is unique for the Russian manufacturing industry. We are interested in creating a domestic industry producing high-tonnage equipment for LNG production, thereby reducing capital costs and increasing our global competitiveness. This entails maximizing the involvement of the Russian scientific and industrial capabilities”, he added


  • Leave a Reply

    Related content
    12.04.2019
    Sovcomflot and Novatek will build an ice-class LNG carrier “Christopfe de Margerie 2.0”, Sovcomflot […]
    27.08.2019
    August 26 Sovcomflot’s Aframax tanker “Korolev Prospect” set sail along the Northern Sea Route […]
    21.10.2019
    Two large-tonnage oil tankers belonging to Sovcomflot’ “Mendeleev Prospect” and “Lomonosov Prospect” completed have […]
    25.04.2019
    Novatek has signed two agreements with Chinese partners on their participation in the Arctic […]
    02.12.2019
    Yamal LNG, a subsidiary of Novatek, has shipped the first cargo of liquefied natural […]
    10.04.2019
    The actual capacity of the three trains of Yamal LNG liquefaction plant is 17.5 […]
  • Login
  • No Fields Found.