Локализация оборудования для СПГ-проектов

Novatek Aims to Localize Manufacturing LNG Production Equipment

  • Novatek and Atomenergomash, a mechanical engineering division of Rosatom State Corporation, signed a memorandum on strategic partnership and localizing the fabrication of critical equipment for LNG production.

    According to Novatek, the memorandum notes the results already achieved on the fabrication of coil-wound heat exchangers and medium-tonnage cryogenic pumps, and establishes the obligations of the Parties on design, manufacturing and conducting pilot tests of high-tonnage cryogenic pumps.

    According to the memorandum, the parties intend to pursue long-term cooperation to localize the fabrication of pumps, heat exchangers and other equipment for Novatek’s LNG projects at the facilities of Atomenergomash.

     “This memorandum is important for the development of the Russian gas industry and the implementation of our new LNG projects using domestic technologies and equipment,” noted Alexander Fridman, First Deputy Chairman of the Novatek Management Board.

    “Atomenergomash has already fabricated and shipped heat exchangers and cryogenic pumps for Yamal LNG’s Train #4 utilizing NOVATEK’s patented “Arctic Cascade” gas liquefaction technology. This equipment is unique for the Russian manufacturing industry. We are interested in creating a domestic industry producing high-tonnage equipment for LNG production, thereby reducing capital costs and increasing our global competitiveness. This entails maximizing the involvement of the Russian scientific and industrial capabilities”, he added


  • Comments: 0

    Leave a Reply

    Related content
    25.04.2019
    Novatek has signed two agreements with Chinese partners on their participation in the Arctic LNG 2 project at […]
    02.04.2019
    For Arctic LNG 2 project
    26.12.2019
    According to the RF Federal Customs Service, Russia’s crude oil export in January-October was up 4.4% year-on-year to […]
    29.07.2019
    On 23 July the Board of Directors of Sovcomflot approved deals with Zvezda Shipyard and VEB-Leasing to place […]
    21.05.2019
    Arctic LNG 2, a joint venture of Novatek, and TechnipFMC signed a contract on engineering, procurement, supply, construction […]
    23.10.2019
    Novatek has announced that Yamal LNG has received notification from TC LNG Shipping L.L.C., the joint venture owningfour […]
    12.12.2019
    Yamal LNG, a subsidiary of Novatek, has reported taking delivery of the 15th Arc7 LNG tanker built for […]
    07.03.2019
    Novatek has announced the closing of the sale of a 10% participation interest in Arctic LNG 2 Project […]
    11.04.2019
    By 2030, Novatek intends to manufacture 70 mn tons of liquefied natural gas annually, told the company’s CJairman […]
    23.05.2019
    Novatek announced signing a Memorandum of Understanding with the Ninh Thuan Provincial People’s Committee to develop an integrated […]
    05.09.2019
    On September 5, Novatek announced at the Eastern Economic Forum in Vladivostok that the participants of Arctic LNG […]
    06.09.2019
    FESCO has signed an agreement with the Chinese logistics operators Best Ship Energy Management and Zhe Jiang Rui […]
  • Fields marker by * are required

    Order research

  • Login
  • Fields marker by * are required

    Buy a subscription for the regular maritime analytical materials of the  Russian Federation

  • Fields marker by * are required

    Buy Subscription for PORTSTAT Russian Ports Analysis Online Service