Из Китая в Калининград за 8 суток

8 Days from China to Kaliningrad

  • The block train that operates China – Europe – China route via Kaliningrad region has delivered the first container for a consignee located in Kaliningrad.

    The 40’ unit laden with consumer goods traveled 8 days from Chongqing to the station of Szerzhinskaya-Novaya.

    It was a pilot project aimed to test block train delivery as an alternative to shipping by sea.

    By the end of Half 2, 2019, Kaliningrad Railway expects to increase deliveries designated for local consignees up to 100 containers per month.

    In 2018, the total container traffic carried by Kaliningrad Railway made 150 thousand TEU, up 24% year-on-year.

     


  • Leave a Reply

    Related content
    27.09.2019
    According to SeaNews PORTSTAT online analytic service (available to subscribers). In July 2019, container […]
    14.01.2019
    Eurosib has launched its first transit train between China and Europe via the Grodekovo […]
    22.03.2019
    COSCO is launching a new feeder service branded RFS4 that will call St. Petersburg […]
    10.07.2019
    According to SeaNews PORTSTAT online analytic service (available to subscribers). In May 2019, container […]
    29.05.2019
    During January-April 2019, the sea ports of Ukraine handled 305.6 thousand TEU, up 18.6% […]
    01.03.2019
    Rail Cargo Logistics – RUS, the Russian division of Austrian Railways’ subsidiary Rail Cargo […]
  • Login
  • No Fields Found.