Первый реактор для атомного ледокола «Чукотка» отправили в Петербург

First Reactor for “Chukotka” Nuclear Icebreaker

  • The machine-building division of Rosatom based in Podolsk has loaded a RITM-200 reactor for delivery to St. Petersburg where it will be installed onto the nuclear icebreaker “Chukotka” currently under construction.

    Since 2013, Rosatom has loaded nine new generation reactor units for universal nuclear icebreakers, the tenth unit is planned for delivery to the yard by the end of 2023, Rosatom said in a statement.

    The “Chukotka” will be the fourth serial Design 22220 nuclear icebreaker built in Russia. The lead vessel in the series, the “Arktika” and two serial icebreakers, the “Sibir” and the “Ural”, are successfully operating in the Northern Sea Route.

    Photo: Rosatom


  • Leave a Reply

    Related content
    08.12.2023
    Russia’s Rosatom State Corporation and DP World are to establish a logistics operator to […]
    06.12.2023
    Winter navigation season 2023-2024 has started in the Russian Gulf of Finland, the RF […]
    10.11.2023
    The “Ural” nuclear-powered icebreaker has left the quay of Baltic Shipyard in St. Petersburg […]
    05.04.2023
    The fifth and the sixth serial nuclear Design 22220 icebreakers will be named “Kamchatka” […]
    26.01.2023
    The lead universal nuclear-powered icebreaker “Arktika” has escorted two LNG tankers, the “Boris Vilkitsky” […]
    15.05.2023
    The keel for a new generation 22740M Design low-draft icebreaker has been laid in […]
  • Login
  • No Fields Found.