The new specialized coal terminal of Sukhodol in the Russian Far East has loaded its first coal in the framework of pre-commissioning and testing the equipment, the RF Federal Agency for Maritime and River Transport report.
The loading of the mv “H Vestal” moored at Berth 1 took 91 hour. The first shipment made 44,000 tons
The terminal capacity at the first stage will make 2 mn tons of coal per annum. In future it is planned to increase the terminal capacity first up to 12 mn tons and later up to 20 mn tons per annum.
Photo: RF Federal Agency for Maritime and River Transport