Первая отгрузка угля на новом терминале «Суходол»

New Sukhodol Terminal Loads First Coal

  • The new specialized coal terminal of Sukhodol in the Russian Far East has loaded its first coal in the framework of pre-commissioning and testing the equipment, the RF Federal Agency for Maritime and River Transport report.

    The loading of the mv “H Vestal” moored at Berth 1 took 91 hour. The first shipment made 44,000 tons

    The terminal capacity at the first stage will make 2 mn tons of coal per annum. In future it is planned to increase the terminal capacity first up to 12 mn tons and later up to 20 mn tons per annum.

    Photo: RF Federal Agency for Maritime and River Transport


  • Leave a Reply

    Related content
    18.10.2023
    The Elga Port marine terminal has been included into the boundaries of the port […]
    19.04.2023
    Russia’s VEB.RF bank has transferred the first 550 mln rubles ($6.1 mln) to GTLK […]
    05.12.2023
    A road map for the Kamchatka LNG terminal project has been developed on commission […]
    25.12.2023
    TransContainer, part of Delo Group, has resumed carrying export designated coal from Irkutsk region […]
    25.01.2023
    Vanino Commercial Sea Port has put into operation a new snow making machine acquired […]
    08.11.2023
    Zabaikalsk Grain Terminal has taken delivery of the first batch of specialized containers manufactured […]
  • Login
  • No Fields Found.