Первая отгрузка угля на новом терминале «Суходол»

New Sukhodol Terminal Loads First Coal

  • The new specialized coal terminal of Sukhodol in the Russian Far East has loaded its first coal in the framework of pre-commissioning and testing the equipment, the RF Federal Agency for Maritime and River Transport report.

    The loading of the mv “H Vestal” moored at Berth 1 took 91 hour. The first shipment made 44,000 tons

    The terminal capacity at the first stage will make 2 mn tons of coal per annum. In future it is planned to increase the terminal capacity first up to 12 mn tons and later up to 20 mn tons per annum.

    Photo: RF Federal Agency for Maritime and River Transport


  • Leave a Reply

    Related content
    05.12.2023
    A road map for the Kamchatka LNG terminal project has been developed on commission […]
    11.10.2023
    October 9, 2023 the first block train carrying cars made in China arrived at […]
    18.10.2023
    The Elga Port marine terminal has been included into the boundaries of the port […]
    01.08.2023
    The RF Ministry for the Development of the Russian Far East and the Arctic […]
    08.11.2023
    Zabaikalsk Grain Terminal has taken delivery of the first batch of specialized containers manufactured […]
    27.12.2023
    Severnaya Zvezda (Northern Star), part of Russian Energy Group, a resident of the Russian […]
  • Login
  • No Fields Found.