На Камчатке построят плавучий СПГ-терминал

LNG FSRU Project for Kamchatka

  • RF President Vladimir Putin has made a decision and gave instructions to build a floating terminal to unload, store and regasify LNG with related infrastructure in the Rakovaya Bay on the Kamchatka Peninsula.

    The project envisages building two LNG carriers to deliver liquefied natural gas from the LNG terminal currently under construction in the Bechevinskaya Bay (the latter project is developed by Novatek).

    The terms of reference for the LNG tankers and the FSRU have already been developed, and the basic technical solutions have been drafted, the press office of the RF Government says.

    The Zvezda Shipbuilding Complex has demonstrated interest in contracting the building of the vessels for the project.


  • Leave a Reply

    Related content
    26.04.2022
    TransContainer has launched a new railway service from its terminal at the station of […]
    30.08.2022
    Container traffic via the Russian Far East sea ports made 157.2 thousand TEU in […]
    26.05.2022
    The port facilities are to undergo a total refurbishment, and an industrial park is […]
    24.01.2022
    Zhejiang Energy International Limited, a 100% subsidiary of China’s state-owned Zhejiang Energy Group, is […]
    16.02.2022
    The Capital of the Arctic Territory of Advanced Development has been expanded to include […]
    20.09.2022
    Far East and Arctic development Corporation and RZD Logistics have signed an agreement on […]
  • Login
  • No Fields Found.