Новый терминально-логистический центр «Восток – Запад»

New Logistics Center in Kaliningrad Region

  • October 1 a new transport and logistics center was inaugurated at the rail station of Chernyakhovsk in Kaliningrad region. The new Vostok – Zapad (East – West) logistics center is located near the Zheleznodorozhny-Skandawa rail crossing on the Russian-Polish border.

    The logistics center will handle export, import and transit containers from/to Asia to/from Europe. In future, it is expected to become one of the key hubs on the New Silk Route.

    The Vostok – Zapad logistics center will transfer containers from the Russian standard 1520 mm gauge onto the European 1435 mm gauge for transportation to the destination in Europe.

    The terminal is equipped with a large gantry crane capable to handle containers on four rail tracks. The annual capacity of the terminal is 450,000 TEU.

    The terminal will start handling the transit rail service between China and Europe operated by UTLC ERA, the regular block trains to the Moscow-based Bely Rast terminal, and the block trains delivering car parts for the Kaliningrad-based Avtotor.

    The Vostok – Zapad terminal is operated by a joint venture between Russian Railways and Novik Group.


  • Leave a Reply

    Related content
    29.03.2021
    An agreement on building a bridge across the Vistula Lagoon (also called the Kaliningrad […]
    10.12.2021
    FESCO Transportation Group is launching a new regular intermodal service branded FESCO West Gate […]
    02.08.2021
    FESCO has launched the first full block train to carry Korean gods to Europe […]
    13.07.2021
    Rosmorport has announced a tender to continue and complete the construction of the international […]
    09.02.2021
    During January 2021, 8.5 thousand TEU transited Kaliningrad Oblast between China and Europe by […]
    10.08.2021
    56.7 thousand TEU, up 4.4-fold year-on-tear, was carried on the Kaliningrad Railway infrastructure during […]
  • Login
  • No Fields Found.