Плавучую буровую установку «Северное Сияние» отбуксировали в Мурманск

Severnoe Siyanie Drilling Rig Arrives at Murmansk

  • The semi-submersible floating production unit “Severnoe Siyanie” (literally, Northern Lights) has been delivered to Murmansk assisted by Rosmorport’s pilots, Rosmorport has reported.

    The rig was delivered on board the Marshall Islands-flagged heavylift vessel “HLV GPO Ametist”, offloaded with the help of port tugboats and positioned in the port basin.

    The “Severnoe Siyanie” is expected to remain in Murmansk till the end of August to be prepared for towage to the place of deployment in the Kara Sea.


  • Leave a Reply

    Related content
    27.07.2021
    Russia’s Volga-Dnepr airline has delivered giant mobile drilling equipment from Calgary in Canada to […]
    05.04.2021
    7.5 mn tons of cargo was carried along the Northern Sea Route during January-March […]
    24.08.2021
    August 9, 2021, Petrolesport terminal, part of Global Ports group, has unloaded the railcars […]
    01.12.2021
    Arctic LNG 2, a subsidiary of Russian gas major Novatek, has signed loan agreements […]
    19.05.2021
    The semi-submersible floating drilling rig “Severnoye Siyanie” has made a call at the port […]
    27.05.2021
    Oberon Ltd., a resident of the RF Arctic Zone, is set to establish a […]
  • Login
  • No Fields Found.