«Звезда» начала строить третий газовоз для «Арктик СПГ-2»

Zvezda Starts Building Third LNG Tanker for Arctic LNG 2

  • Zvezda Shipbuilding Complex has started building a third Arc7 LNG tankers for Novatek’s Arctic LNG 2 project. The project is financed by VEB.RF bank.

    Zvezda has contracts with VEB.RF for 15 LNG carriers that will be deployed to transport liquefied natural gas along the Northern Sea Route under time charter agreements between Sovcomflot (for the first vessel) and Smart LNG, a JV between SCF and Novatek (for the remaining 14 units) and Arctic LNG 2, a subsidiary of Novatek.

    The tankers powered by a 45 MWt propulsion system and equipped with three three rudder propellers will be capable of navigating in ice over 2 meters thick.

    The gas tank system utilized in this project is Mark III membrane type, Zvezda being the first Russian yard to be certified to build such storage system.


  • Leave a Reply

    Related content
    22.07.2021
    Russia’s governmental port property management agency Rosmorport has awarded a contract for building two […]
    29.04.2021
    Novatek’s joint venture Arctic LNG 2 has concluded 20-year LNG Sales and Purchase Agreements […]
    30.03.2021
    RusKhimAlyans and the industrial gases major Linde have signed an agreement of intent for […]
    18.01.2021
    The first Aframax tanker built in Russia, “Vladimir Monomakh” has set sail for her […]
    23.08.2021
    A keel-laying ceremony was held at the Zvezda shipbuilding complex, in Russia’s Far Eastern […]
    12.10.2021
    Sakhalin Energy, the operator of the Sakhalin-2 project, has loaded the first carbon-neutral/offset liquefied […]
  • Login
  • No Fields Found.