Новый ледокол для «Росморпорта» заложили на «Пелле»

Pella to Build New Icebreaker for Rosmorport

  • The Pella Shipyard has laid the keel for a new 18 MWt icebreaker commissioned by Rosmorport, the press office of Rosmorport has informed.

    The contract was signed in September 2019. The Project 21900M2 linear diesel-electric icebreaker is to be deployed in the Russian Far Eastern ports.

    Project 21900M2 is an improved version of Project 21900M and a sistership of the icebreakers “Murmansk”, “Vladivostok”, and “Novorossiysk” with icebreaking characteristics strengthened to meet the Icebreaker7 ice class.

    The vessel is scheduled for delivery in 2024.


  • Leave a Reply

    Related content
    13.05.2020
    The first Russian Aframax tanker “Vladimir Monomakh” has been launched at Zvezda Shipyards in […]
    23.09.2020
    Sergey Nosov, Governor of Magadan Oblast in the Russian Far East, and Alexander Potapov, […]
    20.01.2020
    Republic of Korea’s Hyein E&C has presented a preliminary feasibility study to develop the […]
    15.05.2020
    On May 26, the technical laying of the third serial Project 22220 universal nuclear […]
    09.12.2020
    Baltic Shipyard in St. Petersburg is to commence the construction of a new nuclear-powered […]
    06.10.2020
    The Arctic school of traditional wooden shipbuilding has opened in Arkhangelsk. The project is […]
  • Login
  • No Fields Found.