На «Звезде» началась резка металла для первого танкера-продуктовоза MR на СПГ

Zvezda Shipyard Starts Cutting Steel for First LNG-Powered MR Tanker

  • Zvezda Shipyard in the Russian Far East has started cutting steel for the first Russian-built MR product tanker powered by liquefied natural gas.

    It will be the lead vessels in the series of three to be deployed by Sovcomflot carrying oil products and condensed gas under a time charter agreement with Novatek.

    The IB ice class 50,000 dwt, 180 m LOA and 32 beam ships will have a draft of 13 m. They are designed to operate in the Baltic year-round, including in the ice conditions during winter.

    The vessels will be equipped with a double-fuel technology enabling them to use environmentally clean LNG as bunker fuel.


  • Leave a Reply

    Related content
    11.12.2020
    Zvezda Shipbuilding Complex in the Russian Far East has delivered the first Aframax tanker […]
    08.09.2020
    Arctic LNG 2, a joint venture of Russia’s gas major Novatek, has entered into long-term charter […]
    13.03.2020
    Sovcomflot has published its IFRS results for the full year to 31 December 2019. […]
    22.10.2020
    On October 20, a naming ceremony for a LNG carrier jointly ordered by MOL […]
    07.02.2020
    February 6, the “SCF Angara” tanker en route from Ust-Luga to Copenhagen received a […]
    29.04.2020
    Kronstadt Marine Plant has put into operation the M.I.Surgin dry dock after many years […]
  • Login
  • No Fields Found.