На «Звезде» началась резка металла для первого танкера-продуктовоза MR на СПГ

Zvezda Shipyard Starts Cutting Steel for First LNG-Powered MR Tanker

  • Zvezda Shipyard in the Russian Far East has started cutting steel for the first Russian-built MR product tanker powered by liquefied natural gas.

    It will be the lead vessels in the series of three to be deployed by Sovcomflot carrying oil products and condensed gas under a time charter agreement with Novatek.

    The IB ice class 50,000 dwt, 180 m LOA and 32 beam ships will have a draft of 13 m. They are designed to operate in the Baltic year-round, including in the ice conditions during winter.

    The vessels will be equipped with a double-fuel technology enabling them to use environmentally clean LNG as bunker fuel.


  • Leave a Reply

    Related content
    04.06.2020
    The Main Department of State Expertise of Russia has approved of the design and […]
    07.02.2020
    February 6, the “SCF Angara” tanker en route from Ust-Luga to Copenhagen received a […]
    23.06.2020
    On June 23 the nuclear icebreaker “Arktika”, the lead icebreaker of the 22220 Project, […]
    16.09.2020
    The tanker “Vladimir Monomakh” built at Zvezda Shipyard in the Russian Far East has […]
    26.06.2020
    According to the RF Federal Customs Service, Russia’s crude oil export in January-April 2020 […]
    10.11.2020
    Last week, a flag raising ceremony was held on board the new Russian icebreaker […]
  • Login
  • No Fields Found.