На «Звезде» началась резка металла для первого танкера-продуктовоза MR на СПГ

Zvezda Shipyard Starts Cutting Steel for First LNG-Powered MR Tanker

  • Zvezda Shipyard in the Russian Far East has started cutting steel for the first Russian-built MR product tanker powered by liquefied natural gas.

    It will be the lead vessels in the series of three to be deployed by Sovcomflot carrying oil products and condensed gas under a time charter agreement with Novatek.

    The IB ice class 50,000 dwt, 180 m LOA and 32 beam ships will have a draft of 13 m. They are designed to operate in the Baltic year-round, including in the ice conditions during winter.

    The vessels will be equipped with a double-fuel technology enabling them to use environmentally clean LNG as bunker fuel.


  • Leave a Reply

    Related content
    11.06.2020
    On 9 June 2020 at 06:00 Moscow time “Christophe de Margerie”, an icebreaking LNG carrier […]
    21.12.2020
    St. Petersburg’s Admiralty Shipyards have launched the Project 0093 ice-resistant self-propelled platform “Severny Polyus” […]
    01.09.2020
    Sovcomflot has posted the IFRS results for H1 2020. The Group’s revenue was up […]
    15.09.2020
    On September 14, 2020, Sovcomflot took delivery of SCF Barents, a new 174,000-cbm LNG carrier. […]
    30.04.2020
    The delivery of unique equipment for the largest dry dock in Russia under construction […]
    03.09.2020
    The first Russian-built LNG-powered inland passenger vessel started her maiden voyage on August 30 […]
  • Login
  • No Fields Found.