На НУТЭП пришли новые краны

NUTEP Receives New STS Cranes

  • April 23, the special purpose heavylift vessel “Zhen Hua 19” came to NUTEP terminal in Novorossiysk delivering ZPMC-built  STS cranes for the newly built Berth 38.

    NUTEP Receives New STS CranesThe new berth that will be capable of accommodating ocean-going container ships with a capacity of up to 10 thousand TEU is to be put into operation on July 1. It is 378 m long with a depth of 15.6 m, which allows a draft of 15 m. The total area of the berth is 4 ha.

    Berth 38 is part of the investment project to expand the terminal capacity from the current 350 thousand TEU to 700 TEU per annum. It will be equipped with three 50-ton STS cranes, four 50-ton RTGs and two reach stackers manufactured by ZPMC.

     

     

     

     

     


  • Leave a Reply

    Related content
    06.09.2019
    Vostochny Port has put into operation Stage 3 of its specialized coal terminal. The […]
    30.12.2019
    According to SeaNews PORTSTAT online analytic service (available to subscribers). According to SeaNews’ PortStat […]
    09.07.2019
    Oboronlogictics Group has announced a new container terminal project for Moscow region to be […]
    18.12.2019
    According to SeaNews PORTSTAT online analytic service (available to subscribers). In October 2019, container […]
    13.11.2019
    According to SeaNews PORTSTAT online analytic service (available to subscribers). In September 2019, container […]
    19.03.2019
    Declines month-on-month
  • Login
  • No Fields Found.