Yamal LNG has shipped the second million tonnes of LNG produced at its first LNG train.
The LNG produced at Yamal LNG commenced shipments from December 2017 utilizing Arc7 ice class carriers each holding 170 thousand cbm, or approximately 74 thousand tonnes of LNG.
Yamal LNG reached the second million tonnes shipped on the 27th cargo loaded and dispatched at the Sabetta seaport from the first LNG train.
LNG deliveries under long-term contracts started in April 2018, with four LNG cargos already shipped under such commitments.