На Северной верфи вывели из эллинга траулер «Капитан Брейхман»

Severnaya Verf Moves Fishing Trawler to Open Slipway

  • St. Petersburg-based Severnaya Verf Shipyard has shared a video of moving the fish processing trawler “Kapitan Breikhman” from a sheltered slipway to the open slipway. The operation took some three hours.

    The vessel is being built for NOREBO Group and is part of a series of ten trawlers to be deployed in the Arctic and the Far Easter basins. The launching of the trawler is scheduled for late May – early June this year.

    Photo and video by Severnaya Verf


  • Leave a Reply

    Related content
    24.08.2022
    On August 20, a ro-pax ferry under construction at the Livadia Shipbuilding and Shiprepair […]
    21.06.2022
    The boundaries of the sea port of Magadan in the Russian Far East will […]
    09.02.2022
    Zvezda Shipbuilding Complex has started cutting steel for a seventh Arc7 LNG tanker. The […]
    09.02.2022
    The “Admiral Nevelskoy” designed by Marine Engineering Bureau and built at Nevsky Shipyard has […]
    22.02.2022
    Zvezda Shipbuilding Complex in the Russian Far East has laid the keel for a […]
    11.07.2022
    St. Petersburg-based Admiralty Shipyard has completed the control phase of the sea trials of […]
  • Login
  • No Fields Found.