Самая мощная в России линия погрузки угля

OTEKO Inaugurates Russia’s Largest Coal Loading System

  • OTEKO Group has put into operation the largest and most powerful coal loading system in Russia at its terminal in the port Taman at the conjunction of the Black Sea and the Sea of Azov.

    The system consists of a reclaimer with 10.6 m bucket wheel, a roofed conveyor belt and a vessel loading machine. With a loading speed of 8,000 tons per hour it allows of reducing the loading time for a Capesize bulker from the current 48 hours to 25 hours.

    In the near future, OTEKO plans to put into operation another similar powerful loading system. After it is put into operation in 2022, the terminal capacity will make 72 mn tons per annum.


  • Related content
    17.11.2021
    TransContainer and SUEK have concluded an agreement to develop containerized coal transportation via the […]
    30.03.2021
    The coal port of Shakhtersk on the island of Sakhalin is to be modernized. […]
    16.04.2021
    The port of Shakhtersk on Sakhalin Island has handled its first Capesize bulker. The […]
    27.01.2021
    The article is based on SeaNews PORTSTAT online service (available for SeaNews subsribers). Demo […]
    28.04.2021
    The port of Shakhtersk has been the first on the island of Sakhalin to […]
    09.07.2021
    Novorossiysk Commercial Sea Port has received new forklift trucks made by Konecranes. The lot […]
  • Login
  • No Fields Found.