Запущена вторая очередь системы орошения угольных складов в порту Посьет

Stage Two of Coal Terminal Sprinkling System in Operation in Posyet

  • Mechel-Trans operated Posyet Commercial Port has put into operation stage 2 of specialized dust suppression equipment at its open coal storage facility.

    The second stage consists of seven automatic sprinklers that function as natural rain using up to 96 cubic meters of water an hour. In combination with snowmaking machines implemented earlier the sprinklers are to provide humidification preventing dust formation.

    The dust suppression system is operated in a remote mode from the central control tower, with special software synchronizing handling equipment operations with sprinklers.


  • Leave a Reply

    Related content
    15.03.2021
    According to the RF Federal Customs Service, in January 2021 Russia exported 12.2 mn […]
    12.01.2021
    Rosmorport has put into operation the first stage of the basin of the coal […]
    20.09.2021
    The construction of the new port of Lavna has commenced in Murmansk Oblast. The […]
    28.04.2021
    The port of Shakhtersk has been the first on the island of Sakhalin to […]
    16.04.2021
    The port of Shakhtersk on Sakhalin Island has handled its first Capesize bulker. The […]
    02.11.2021
    Vanino Port has concluded a contract worth 20 mn rubles ($25.8 thousand) to develop […]
  • Login
  • No Fields Found.