«Звезда» начала строительство третьего танкера-продуктовоза MR

Zvezda Starts Building Third LNG-Powered MR Product Tanker

  • Zvezda Shipbuilding Complex has started building a third LNG-powered MR product tanker, with steel cutting commenced, the yards said in a statement.

    The 50 dwt tanker will have a length of over 180 m and a width over 32 m with a draft of 13 m. The vessel will have a 1B ice class allowing it to operate year-round in the ice conditions of the Baltic.

    The tankers of the series are designed for transporting oil products and condensed gas and will be deployed on long-term time-charter agreements between Sovcomflot and Novatek.

    The vessels will be powered by liquefied natural gas.


  • Leave a Reply

    Related content
    17.06.2021
    On 15 June 2021, a keel-laying ceremony was held at Zvezda Shipbuilding Complex in […]
    18.05.2021
    RF President Vladimir Putin had a working meeting with Leonid Mikhelson, Chairman of the Management Board of Novatek. […]
    12.10.2021
    Sakhalin Shipping Company (SASCO) has been awarded a contract to transport cargo for Novatek. […]
    16.11.2021
    Sovcomflot has released its Consolidated Financial Statements for the period ending 30 September 2021. […]
    04.06.2021
    On June 4, 2021, Sovcomflot and Sakhalin Energy, the operator of the Sakhalin-2 project, […]
    13.12.2021
    December 7 the Samus Shipbuilding and Shiprepair yard started the construction of a series […]
  • Login
  • No Fields Found.