Реконструкция причала в Тамани

Berth Reconstruction in Taman

  • Berth N4 used for handling liquefied petroleum gas at the Taman Handling Complex in the port of Taman is to be reconstructed. The Main Department of State Expertise has approved the project aimed to expand the terminal capacity and accommodate larger LPG carriers at the modernized Berth 4.

    After completing the reconstruction, the berth will be capable of loading up to 2.5 mn tons of propane and butane per annum onto vessels up to 54,000 dwt, while at present the maximum deadweight of LPG carriers served is 23,000 tons. The berth length will be increased to make 298.2 m.

    The overall annual capacity of the terminal will remain 3.5 mn tons, freight traffic will be distributed between all the berths.


  • Leave a Reply

    Related content
    11.04.2022
    Russian Railways inaugurated the refurbished border crossing point of Zabaikalsk on the Russian-Chinese border […]
    07.11.2022
    The Main Department of State Expertise of the Russian Federation has approved of the […]
    13.12.2022
    TransContainer has completed the reconstruction of its Bazaikha container terminal in Krasnoyarsk increasing its […]
    21.03.2022
    The Main Department of State Expertise has approved of the project aimed at the […]
    28.02.2022
    Novaya Pristan, a joint venture between Novorossiysk-based NZT and NKKhP, both parts of Demetra […]
    15.07.2022
    The Main Department of State Expertise has approved project documentation and engineering survey results […]
  • Login
  • No Fields Found.