Новый кран на «Терминале Астафьева»

Terminal Astafiev Installs New Crane to Handle Solid Bulk and Containers

  • Last week, a new Liebherr LPS 280 portal crane was mounted at Terminal Astafiev in the port of Nakhodka in the Russian Far East.

    The new equipment is to be put into operation in March 2022 after commissioning it, training the personnel and registering the equipment with the regulatory authorities concerned.

    The operator said it intends to use the crane to handle both solid bulk and container.

    During 2021, Terminal Astafiev handled 3.9 mn tons of cargo, up 9.1% year-on-year, all the throughput being coal.


  • Leave a Reply

    Related content
    23.11.2022
    Nakhodka Commercial Sea Port has acquired a new Russian made Vityaz crane with a […]
    30.03.2022
    The first vessel has been handled at the new berth built in the port […]
    04.10.2022
    A transport and logistics center is to be built in the Khabarovsk territory of […]
    17.05.2022
    Russia’s SMM Group has embarked on a large-scale project to modernize and deliver heavylift […]
    25.05.2022
    RF President Vladimir Putin has made a decision and gave instructions to build a […]
    10.08.2022
    The construction of a terminal to help develop the Pavlovskoe lead and zink concentrate […]
  • Login
  • No Fields Found.