Новый кран на «Терминале Астафьева»

Terminal Astafiev Installs New Crane to Handle Solid Bulk and Containers

  • Last week, a new Liebherr LPS 280 portal crane was mounted at Terminal Astafiev in the port of Nakhodka in the Russian Far East.

    The new equipment is to be put into operation in March 2022 after commissioning it, training the personnel and registering the equipment with the regulatory authorities concerned.

    The operator said it intends to use the crane to handle both solid bulk and container.

    During 2021, Terminal Astafiev handled 3.9 mn tons of cargo, up 9.1% year-on-year, all the throughput being coal.


  • Leave a Reply

    Related content
    04.10.2022
    A transport and logistics center is to be built in the Khabarovsk territory of […]
    24.08.2022
    On August 20, a ro-pax ferry under construction at the Livadia Shipbuilding and Shiprepair […]
    25.05.2022
    RF President Vladimir Putin has made a decision and gave instructions to build a […]
    30.08.2022
    Container traffic via the Russian Far East sea ports made 157.2 thousand TEU in […]
    26.10.2022
    FESCO has launched a new regular rail container service branded FESCO Kuban Shuttle from […]
    17.06.2022
    FESCO Transport Group and Zabaikalsk Kray Government signed an agreement on cooperation in developing […]
  • Login
  • No Fields Found.