Ледокол «Москва» отдали на Дальний Восток

Icebreaker ”Moskva” Transferred to Far East

  • The icebreaker “Moskva” has been officially transferred to the Far Eastern branch of Rosmorport. Previously, the vessel was part of the fleet operated by the North-Western branch of Rosmorport.

    The 114 m LOA 27.5 m beam diesel-electric icebreaker is the lead ship in the 21900 Project series was built in 2008 at the Baltic Shipyard in St. Petersburg.

    This winter, the vessel operated in the region escorting vessel to and from the ports of Vanino and Prigorodnoe.

    At present the ”Moskva” is undergoing maintenance in Vladivostok and is scheduled to dock for repair before the start of the new winter navigation of 2021-2022, when it will be again deployed in Vanino and Prigorodnoe.


  • Leave a Reply

    Related content
    04.03.2021
    The newbuild ro-pax “Admiral Nevelskoy” has set sail for Sakhalin Island in the Russian […]
    09.12.2021
    The start of the icebreaking period is announced in the Big port of St. […]
    22.07.2021
    Russia’s governmental port property management agency Rosmorport has awarded a contract for building two […]
    19.11.2021
    The nuclear-powered icebreaker 22220 Design “Sibir“ has set off for sea trials in the […]
    03.08.2021
    FESCO Group has started seasonal service from Chinese and US ports to Chukotka in […]
    08.12.2021
    Atomflot, the operator of Russia’s nuclear-powered icebreaker fleet, has posted some statistics of this […]
  • Login
  • No Fields Found.