Maintenance dredging has been completed in the basin of Shakhtersk sea port on the island of Sakhalin and in the entrance channel, the RF Federal Maritime Agency for Maritime and River Transport (Rosmorrechflot) has reported.
The work was performed by a group of Rosmorport vessels including the non-self-propelled dredger “Primorets”, the self-propelled barge “Nevskaya”, the non-self-propelled barge M-350“ and the tugboat “Viktor Olenich”.
The project depth in the entrance channel is 4.5 meters to be confirmed by measuring.
Photo: Rosmorrechflot