Плавучая буровая установка впервые в порту Восточный

First FSU Calls at Vostochny

  • The semi-submersible floating drilling rig “Severnoye Siyanie” has made a call at the port of Vostochny in the Russian Far East to be loaded on board a special purpose vessel for transportation to the place of deployment.

    The deepwater port of Vostochny can accommodate vessels up to 400 m LOA and with a draft up to 178 m. However, the operation involving a call of a drilling rig and loading the unit on board a heavylift vessel has been implemented in Vostochny for the first time, according to the RF Federal Agency for Maritime and River Transport.

    The “Severnoye Siyanie” will be deployed on the Russian Arctic shelf. The Gazprom-owned rig is designed for drilling exploration and production oil and gas wells. The unit has a displacement of 59 thousand tons and a crew of 76 people. The “Severnoye Siyanie” was built at the Vyborg Shipyard.


  • Leave a Reply

    Related content
    14.09.2021
    Ruscon, part of Delo Group, has successfully completed the delivery of another batch of […]
    06.09.2021
    Vostochny Port andf RZD Business Asset, a container operating subsidiary of Russian Railways, signed […]
    24.08.2021
    August 9, 2021, Petrolesport terminal, part of Global Ports group, has unloaded the railcars […]
    13.08.2021
    The semi-submersible floating production unit “Severnoe Siyanie” (literally, Northern Lights) has been delivered to […]
    25.05.2021
    The Saratov branch of RZD Logistics has organized the transportation of a heavy mechanical […]
    07.09.2021
    FESCO will be the single logistics operator providing cargo loading / unloading and transportation […]
  • Login
  • No Fields Found.