Надежды оправдались

New Baku Port Development Continues

  • During 2018, container traffic via the new Baku international sea port in Alyat grew 49% up to 23 thousand TEU, as a port representative told SeaNews at the TransRussia exhibition in Moscow.

    Stage 1 of the port construction was completed last year. According to the port representative, the first stage proceeded as planned, with container throughput and passenger traffic demonstrating growth.

    All in all in 2018 Alyat handled 3.8 mn tons, over 21 thousand vehicles and 43 thousand railcars. The annual capacity of the new port is 15 mn tons of cargo, including 100 thousand TEU.

    In a year, the construction of stage 2 is scheduled to start. After completion, the annual capacity of the port will increase up to 25 mn tons including 500 thousand TEU. Stage 3 is also envisaged.

    The old historic port in the city center of Baku is continuing operating, but, in the near future all its activities are to be transferred to Alyat.


  • Leave a Reply

    Related content
    22.07.2019
    According to SeaNews PORTSTAT online analytic service (available to subscribers). In May 2019, container […]
    19.04.2019
    Kaliningrad Region is ready to present two port development projects, said Denis Saliy, Head […]
    14.02.2019
    VTB Bank and Novorossiysk Commercial Sea Port have signed a binding agreement on the […]
    14.02.2019
    Worth 90 bn rubles for 70 mn tons
    05.12.2019
    According to SeaNews PORTSTAT analytic online service, the total container throughput of all the […]
    06.02.2019
    According to Russian Railways, the loading of export designated cargo destined for Russian sea […]
  • Login
  • No Fields Found.