На Транссибе начали строить новый тоннель

New Tunnel to Be Built on TransSiberian Railway

  • Russian Railways have embarked on a project to build a new tunnel on the Ulruchyi – Kovali section of the TransSibrian Railway in Amur region, Russian Railways said in their social media account.

    The new Kerak tunnel will have two tracks and will be 926.9 meter long. It will replace the existing 910-meter long tunnel that was built in 1911 and is not large enough to cope with the growing traffic.

    The new tunnel will be located not far from the old one. It will be the longest tunnel on the Zabaikalsk Railway. 200 people and 30 units of various machinery will be deployed to build the new tunnel.

    After the new tunnel is put into operation, the old one will be used as a drainage and evacuation facility.

     


  • Leave a Reply

    Related content
    07.04.2021
    The construction of Russia’s first international cableway across the Amur River between Blagoveschensk in […]
    20.07.2021
    On July 19, the first vessel – the “Belfuji” bulk carrier flying the flag […]
    09.11.2021
    Russia’s TransContainer in cooperation with Republic of Korea’s Pantos Logistics and PKP LHS of […]
    09.07.2021
    Novoroslesexport, a subsidiary of Novorossiysk Commercial Sea Port, has obtained a permission to develop […]
    29.07.2021
    On July 28, RF President Vladimir Putin took part, via videoconference, in a ceremony […]
    26.07.2021
    On June 25, freight trains started running via the bridge over the Areda River […]
  • Login
  • No Fields Found.