Первая партия СПГ из Сабетты

First LNG Shipped from Yamal

  • Извините, этот техт доступен только в “Eng”.

    December 8 the LNG tanker “Christophe de Margerie” took on board the first cargo of liquefied natural gas produced by Novatek at its new Yamal LNG plant in Sabetta.

    According to Novatek, the first shipment of 170 thousand cubic meters was sold to Petronas LNG UK Limited (PLUK).

    LNG sales according to the long-term contracts will commence in April 2018. All LNG sales prior to that date will be sold by Yamal LNG shareholders on a spot basis.

    The ceremony in Sabetta was attended by RF President Vladimir Putin who gave a command to start the loading, and governmental officials.

    Photo: Rosmorport


  • Добавить комментарий

    Новости по теме
    29.06.2017
    Mitsui O.S.K. Lines, Ltd. (MOL) подписал договор фрахтования на длительный срок на четыре LNG-танкера, […]
    24.01.2017
    Первый в мире LNG-танкер самого высокого ледового класса, построенный Daewoo Shipbuilding & Marine Engineering […]
    06.12.2017
    Подготовка по требованиям Полярного кодекса в «Макаровке» будет вестись также на примере флота и […]
    29.03.2017
    По информации ФГУП «Росморпорт», 28 марта к технологическому причалу № 2 морского порта Сабетта […]
    15.06.2017
    Вице-премьер Дмитрий Рогозин опубликовал в твиттере фото первой очереди завода по сжижению природного газа, […]
    29.11.2017
    ОАО «Ямал СПГ» получило государственное разрешение на ввод в эксплуатацию основных технологических объектов 1-й […]


  •  




  • Войти
  • Поля не найдены.
  • Поля не найдены.