В Приморском крае построят терминал по перевалке СУГ

LPG Terminal Project in Vladivostok

  • The RF Main Department State Expertise has considered the project documentation and engineering surveys for a liquefied petroleum gas terminal in the Perevoznaya Bay in Primorsky Kray in the Russian Far East and granted its approval.

    The terminal will be located in the settlement of Primorsk within the boundaries of the sea port of Vladivostok. The planned annual capacity is up to 1 mn tons of propane, butane, and propane/butane mixture per annum.

    The infrastructure will include railway tracks and loading pipe racks, storage tank farms, truck loading facilities, technology pipelines, a laboratory and other facilities and communications.

     


  • Leave a Reply

    Related content
    26.01.2022
    FESCO Group has launched a new intra-Russia container train service from Vladivostok in the […]
    18.01.2022
    The RF Main Department State Expertise has repeatedly considered the project documentation and engineering […]
    22.03.2022
    Alexey Chekunkov, Minister for the development of the Russian Far East and Arctic, has […]
    13.01.2022
    Sea Terminal Coalstar Ltd has developed a project to build a sea port in […]
    04.02.2022
    The first combined block train consisting of 76 fitting platforms has left Vladivostok in […]
    19.01.2022
    Developing a container terminal in the Caspian port of Olya is a priority, Astrakhan […]
  • Login