Первый контейнерный поезд с грузами для строительства газохимического комплекса в Усть-Луге

Block Train with Cargo for Ust-Luga Gas Processing Complex Arrives to St. Petersburg

  • On March 15, a block train from Chengdu in Sichuan, China, arrived at the Russian Railways’ multimodal terminal at the station of Shushary in St. Petersburg.

    The train delivered 50 containers (100 TEU) laden with modular structures and materials for the gas processing complex to be built in Ust-Luga.

    The Russian leg of the journey was more than 6 km long. The logistics scheme was developed in cooperation with Translogistic and China’s Chengdu International Railway Service.

    In the near future, other block trains are to follow on this route.


  • Leave a Reply

    Related content
    09.12.2021
    On week 49, the Baltic market was stable, freight rates demonstrated a significant growth. […]
    10.08.2021
    56.7 thousand TEU, up 4.4-fold year-on-tear, was carried on the Kaliningrad Railway infrastructure during […]
    12.07.2021
    TransContainer has launched a regular block train from Moscow to Kaliningrad with a weekly […]
    24.06.2021
    TransContainer in cooperation with Chinese and European partners has organized a test block train […]
    16.09.2021
    On week 37, freight rates in the Baltic region short sea market mover up. […]
    12.10.2021
    Last week, the bulker “Roland Oldendorff” left the Yug-2 terminal in the Russian Baltic […]
  • Login