Подходы к порту «Лавна» в Мурманске углубят

Lavna Fairway Dredging Project Approved

  • Извините, этот техт доступен только в “Американский Английский”. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.

    The Main Department of State Expertise has approved of the project documentation and engineering survey for dredging the port basin and approach fairways of the Lavna coal terminal in Murmansk.

    The project envisages dredging the fairway up to the depth of 21.15 m and the terminal basin up to 20.9 m. An area of more than 210.5 thousand square meters is to be dredged.

    The construction of the new port of Lavna on the west shore of the Kola Bay started in autumn 2021. Initially, the project was aimed at handling coal. Now, container operations are also being considered.

    The project is scheduled for completion by 2023.


  • Добавить комментарий

    Новости по теме
    21.03.2022
    В рамках рабочей поездки в Мурманскую область министр РФ по развитию Дальнего Востока и […]
    01.03.2022
    Главгосэкспертиза России рассмотрела проектную документацию и результаты инженерных изысканий на дноуглубление акватории и водных […]


  •  




  • Войти