Локализация оборудования для СПГ-проектов

Novatek Aims to Localize Manufacturing LNG Production Equipment

  • Novatek and Atomenergomash, a mechanical engineering division of Rosatom State Corporation, signed a memorandum on strategic partnership and localizing the fabrication of critical equipment for LNG production.

    According to Novatek, the memorandum notes the results already achieved on the fabrication of coil-wound heat exchangers and medium-tonnage cryogenic pumps, and establishes the obligations of the Parties on design, manufacturing and conducting pilot tests of high-tonnage cryogenic pumps.

    According to the memorandum, the parties intend to pursue long-term cooperation to localize the fabrication of pumps, heat exchangers and other equipment for Novatek’s LNG projects at the facilities of Atomenergomash.

     “This memorandum is important for the development of the Russian gas industry and the implementation of our new LNG projects using domestic technologies and equipment,” noted Alexander Fridman, First Deputy Chairman of the Novatek Management Board.

    “Atomenergomash has already fabricated and shipped heat exchangers and cryogenic pumps for Yamal LNG’s Train #4 utilizing NOVATEK’s patented “Arctic Cascade” gas liquefaction technology. This equipment is unique for the Russian manufacturing industry. We are interested in creating a domestic industry producing high-tonnage equipment for LNG production, thereby reducing capital costs and increasing our global competitiveness. This entails maximizing the involvement of the Russian scientific and industrial capabilities”, he added


  • Comments: 0

    Leave a Reply

    Related content
    13.06.2019
    During the St. Petersburg International Economic Forum Leningrad Oblast Governor Alexander Drozdenko and Kirill Seleznev, Managing Director of RusKhimAlyans, […]
    29.03.2019
    LNG export surging
    09.01.2019
    From new Russian Zvezda shipyard
    25.04.2019
    Novatek has signed two agreements with Chinese partners on their participation in the Arctic LNG 2 project at […]
    11.04.2019
    By 2030, Novatek intends to manufacture 70 mn tons of liquefied natural gas annually, told the company’s CJairman […]
    07.03.2019
    Novatek has announced the closing of the sale of a 10% participation interest in Arctic LNG 2 Project […]
    30.05.2019
    According to the RF Federal Customs Service’ statistics, during the first three months of 2019 Russia exported some […]
    01.03.2019
    End of March 2019, Novatek is to launch a medium-scale LNG plant in Vyssotsk on the Baltic with a capacity of 600,000 […]
    10.04.2019
    The actual capacity of the three trains of Yamal LNG liquefaction plant is 17.5 mn tons, told Novatek […]
    01.07.2019
    On June 29, 2019 during the G20 summit in Osaka Novatek and the consortium of Mitsui & Co […]
    20.03.2019
    The RF Government approved the investment project aimed at building an LNG terminal on the Kamchatka Peninsula by […]
    02.04.2019
    For Arctic LNG 2 project
  • Fields marker by * are required

    Order research

  • Login
  • Fields marker by * are required

    Buy a subscription for the regular maritime analytical materials of the  Russian Federation

  • Fields marker by * are required

    Buy Subscription for Foreign Trade via Russian Ports Analysis Online Service